Slab-on-grade foundation
On a slab, the band is laid along the footing trench and the slab edge before the concrete is poured. Each line passing through the slab is treated at its entry point and shown on the sketch.
A termite zone placed while the excavation is still open in Blue Springs and Jackson County, with the openings and the trenches mapped for the builder and the owner.
Fastest: call (855) 974-4733. Or send this and we call you back.
Pre-construction termite treatment places a termiticide zone in the soil around a new foundation before the site is backfilled and finished. Because the excavation is open, the zone can be applied evenly, and each opening the Extension names as a common entry is mapped on the same sketch. The builder and the owner each receive the record.
The easiest moment to protect a new foundation is the one before the ground closes over it. Once the slab is poured and the trenches are backfilled, the soil beside the wall is hard to reach and the band is hard to lay evenly. Treatment in that open window is planned around the builder's sequence of work.
The University of Missouri Extension says that on slab construction termites commonly enter through expansion joints, cracks and utility or sewer openings. Those are the features the zone is planned around, and they are drawn on the sketch while the trenches are still open and the lines are not yet covered.
The records matter as much as the application. This page does not describe a local building requirement, because none is on file for this site. It describes the work, the paperwork and the decisions that the owner and the builder should settle before the excavation is closed.
Fence off open trenches and keep the treated ground undisturbed until the technician signs off the band. Do not stack timber or form boards against the treated foundation, and do not apply any product yourself.
The technician and the builder fix the dates for open soil, footing readiness and backfill. Treatment placed after the soil is covered is harder to apply evenly, so the calendar is set first.
Footing trenches, the slab edge, utility trenches and any stored timber are mapped. The sketch shows where the band must be hand-applied and where future access will be needed.
The band runs beneath and beside the footings and along the slab edge. Its depth and width are logged, and each utility penetration is treated where the line enters the structure.
The record carries the sketch, the application date, the product class and each location where a later trench must be re-treated. Copies go to the builder and the owner.
Any disturbed stretch is re-treated and the record amended. Where a sewer or water line must be dug through the band, a second visit is booked into the same window.
Excavated ground is open long enough to see the footings, the soil profile and the slab edge. A band can be laid evenly along each side at that stage, which is much harder once the trench has been filled and graded.
An open trench shows the technician the footing, the soil layers and the slab edge in one view. The band goes on evenly along each face, and its depth can be checked against the sketch as the work proceeds. Once the trench is backfilled, none of that can be confirmed.
The timing also divides responsibility. The builder controls the open ground and the technician controls the band. Agreeing the sequence in advance means neither waits on the other, and the record shows who did which part and when.
The owner keeps the sketch, the application record, the product class and the list of places where the band was disturbed and re-treated. A later technician or buyer needs those documents to trace the band over the life of the building.
The record is a working file. It shows where the band runs, where a later trench broke it and where it was re-treated. A new bed, a fence post or a water line dug after handover changes the band, so the owner should tell the technician before the digging starts.
The builder should also have a copy, because handover paperwork often asks for it. The technician does not warrant the building, and the record does not define the builder's obligations. It states what was applied, where and on what date.
On a slab, the band is laid along the footing trench and the slab edge before the concrete is poured. Each line passing through the slab is treated at its entry point and shown on the sketch.
An open crawl leaves soil exposed beneath the future floor, so that soil is treated as well as the perimeter. Access is agreed with the builder before the floor is framed.
An addition meets a building that already has a band. The join is measured, the new perimeter is treated and the record marks where the old and new bands meet.
New work in Blue Springs and across Jackson County follows the same wood-destroying insect standard as existing houses, so the record layout does not change.
Builds in Grain Valley, Lee's Summit and Independence are scheduled with the builder directly, using the same sketch format.
The University of Missouri Extension gives general guidance on termites in new construction. The plan for the building in front of the technician is drawn from that guidance and from the site.
Call any hour and explain what is going on. You get a clear price before any work starts.
Not sure if you're covered? Check your ZIP code.
A measured band of treated soil around the foundation in Blue Springs and Jackson County, drawn on a sketch that stays with the building.
A check of the joints, cracks and utility openings in a slab house in Blue Springs and Jackson County, where termites commonly enter a slab.
A written survey of the wood, the foundation and the soil line in Blue Springs, with each finding tied to its evidence and the treatment options laid out before any product is used.
A written wood-destroying insect report for a sale in Blue Springs and Jackson County, drafted so buyer, seller and agent can read the same limits.
A wood-destroying insect inspection in a Blue Springs home sale checks the wood for termites and related insects, and writes down what was found and what could not be examined.
The University of Missouri Extension's guide on subterranean termites says four Reticulitermes species occur naturally in Missouri, all of them living in the soil.
On slab construction, the University of Missouri Extension says termites commonly enter through expansion joints, cracks, and utility or sewer openings.
No. The band is laid during construction. A later inspection examines the finished building and the band together, and it is booked separately.
The disturbed stretch is re-treated and the record amended. The builder should tell the technician before digging so the second visit can be booked into the same window.
The builder and the owner each receive a copy of the sketch, the record and the product class, and the owner keeps the file for the life of the building.
No. It is a soil and foundation treatment during construction. A home inspection examines the finished building, and a wood-destroying insect inspection is a separate job.