Established house with beds and shrubs
Most work is done around planting that is already in place. The band is drawn to avoid roots where possible, and each shrub or bed that limits the band is recorded.
A measured band of treated soil around the foundation in Blue Springs and Jackson County, drawn on a sketch that stays with the building.
Fastest: call (855) 974-4733. Or send this and we call you back.
Soil-line termite treatment forms a measured band of treated soil around the foundation and beneath the points where wood meets the ground. The University of Missouri Extension notes that infestations usually begin in the soil. The band is sized from the building, the grade and the inspection, and its layout is recorded so later work does not disturb it by accident.
The soil is the route. Subterranean termites travel through it to reach wood, and the Extension's guide says the usual sequence is soil first, then the wood or foundation wall beside it. A treatment placed in the soil therefore sits on the path, not at the far end where the damage shows.
Each house in Blue Springs has its own soil profile, and no two bands look alike. A slab with a narrow bed, a crawl with a deep mulch border and a split-level with a retaining wall each need the band measured where the soil actually is. The technician walks the perimeter, notes the disturbed ground and draws the band from those measurements.
A soil treatment answers a finding. It does not replace the inspection, and it is not a cure for moisture. When the wood is sound and the conditions are dry, the plan may be monitoring alone. When the wood is attacked, the band is applied and the conditions that undo it are listed for the owner to address.
Keep children and pets off a freshly treated band until the technician confirms it is safe. Do not dig into the band, and do not apply a product to the soil yourself, since a wrong product or dose changes what the band can do.
The technician walks the entire foundation, marking grade, drainage, beds and any wood at ground level. Cracks and disturbed soil go on a sketch of the perimeter.
The band is drawn from the wall outward and from the grade downward, with its width and depth stated. Places the band cannot reach, such as under a patio or against a retaining wall, are listed with the reason.
Application is staged around soil moisture and the weather. Before each stage the household is told the timing and the areas to keep clear until the technician confirms they have dried.
The final layout, the application dates and the product class are filed with the sketch. Any later digging through the band is logged against that sketch.
The return visit examines the band, the wood at grade and any new tube. Drainage and mulch changes are recommended, and the owner decides which to make.
The band's dimensions come from the building and the inspection, not from a standard. Width is measured out from the wall and depth down from the grade, and both are written on the sketch.
A slab house with a narrow bed against the brick needs a different band from a crawl house with a deep border of mulch. The technician measures the actual soil and the points the wood can be reached from, and sets the band to cover them. The measurements are the record, so the next person can check them.
Where the band cannot be applied, the report says so and gives the reason. A gap is not a failure, but it is a place the owner should watch, and the technician marks the spots most likely to need a second check.
The band works on termites in the soil. Water running onto the bed, a crawl that stays damp and a gutter that discharges at the wall all keep the soil and the wood moist, and the band cannot change that.
Moisture is the condition that termites respond to most strongly. Water that drains from a roof into the bed beside the foundation keeps the wood at grade damp whatever the band contains. The technician traces the water and explains what would stop it, and the owner decides on the repair.
Grade and mulch matter for the same reason. Soil above the first course of brick, or mulch that climbs the siding, creates a covered route that goes around the band. The report names those places, and the return visit looks at them again.
On a slab house the band meets the slab edge and its openings. The technician sets the band so that soil at the joints and beside each utility line is treated, and the openings are recorded on the same sketch.
Soil beside a joint or a sewer line is treated as part of the band, and the sketch marks every opening the band reaches. An opening outside the reach of the band is recorded so that sealing can cover it.
The owner gets one sketch with both the band and the openings, so a later technician sees the whole arrangement at once instead of two separate records.
Most work is done around planting that is already in place. The band is drawn to avoid roots where possible, and each shrub or bed that limits the band is recorded.
A crawl adds soil under the floor. The band runs under the structure through access openings as well as along the perimeter, and each opening appears on the sketch.
A regrade moves the grade the band was built on. The layout is measured again from the new ground, and the old record is kept beside it so the change is visible.
Soil bands in Blue Springs are laid out lot by lot, because grade and bed design change from one address to the next.
The same layout method applies in Grain Valley, Lee's Summit and Independence, though each band is measured on its own property.
Drainage and mulch are the owner's to change. The technician names the ones working against the building and explains why.
Call any hour and explain what is going on. You get a clear price before any work starts.
Not sure if you're covered? Check your ZIP code.
A written survey of the wood, the foundation and the soil line in Blue Springs, with each finding tied to its evidence and the treatment options laid out before any product is used.
A check of the joints, cracks and utility openings in a slab house in Blue Springs and Jackson County, where termites commonly enter a slab.
A termite zone placed while the excavation is still open in Blue Springs and Jackson County, with the openings and the trenches mapped for the builder and the owner.
One survey that covers the whole structure in Blue Springs and Jackson County, followed by a written scope that the owner reviews before any product goes down.
The University of Missouri Extension's guide on subterranean termites says four Reticulitermes species occur naturally in Missouri, all of them living in the soil.
On slab construction, the University of Missouri Extension says termites commonly enter through expansion joints, cracks, and utility or sewer openings.
No. The inspection finds termites and damage. A band is one response to the findings, and some houses need only the inspection. The report says which applies.
The technician explains how long the band is expected to work and which checks show when it needs attention. No duration is promised on this page, because it depends on the product, the soil and the building.
Usually not. The household is told which rooms and outdoor spaces to keep clear, and for how long, before the application starts.
Ask first. Mulch or soil against the foundation can change the band and the moisture, so the technician says what can go where and how high.